EPA 608 Type II (High-Pressure) — practice test
Type II is the EPA Section 608 certification for medium-, high- and very-high-pressure appliances, except small appliances and MVACs (40 CFR 82.161). High-pressure refrigerants named in the rule include R-22, R-407A, R-407C, R-410A and R-502. You need it to maintain, service, repair or dispose of those appliances, unless you are an apprentice under close and continual supervision by a certified tech. The questions turn on exact numbers: leak rates, vacuum levels and the 200-pound split. Learn those cold and the rest is shop sense.
Studying for EPA 608 Type II (High-Pressure)? Overhaul Prep has 175 questions written to EPA's own topic list for this part. A second expert worked out each answer and read the regulation section it cites before it went live, and every explanation ends with that source, so you can look it up.
What's on the EPA 608 Type II (High-Pressure) test
Appendix D builds a Type II test from 25 Core questions and 25 Type II questions, closed book and proctored, and you need 70 percent to pass. Universal is Core plus all three Types, 100 questions, at the same 70 percent. The regulation gives no time limit and no fee amount, so ask your certifying organization. EPA's topic list for Type II has six blocks: leak detection, leak repair requirements, recovery techniques, recovery requirements, refrigeration and safety. Leak detection and repair cover signs of a leak, leak testing before charging, the order of test gases, allowable leak rates, records and extensions. Recovery covers speeding it up and the evacuation table, refrigeration covers identifying refrigerants, pressure-temperature relationships and why hydrocarbons are not approved for retrofits, and safety covers hermetic compressors under vacuum and equipment rooms.
EPA's test topics: Type II · High-pressure appliances
EPA publishes the topics each Section 608 certification test covers. This is EPA's list for Type II · High-pressure appliances, in EPA's words: its 6 areas and 24 topics. Every one of our 175 E608T2 questions ends with the regulation section or practice it rests on.
The real test, per 40 CFR 82 Subpart F, Appendix D: 25 questions from this part alongside the 25 Core questions; 70 percent passes; closed book.
ALeak Detection3 topics
- 1.Signs of leakage in high-pressure systems (excessive superheat, traces of oil for hermetics)
- 2.Need to leak test before charging or recharging equipment
- 3.Order of preference for leak test gases [nitrogen alone best, but nitrogen with trace quantity of hydrochlorofluorocarbon (HCFC)-22 (also called R-22) better than pure refrigerant]
BLeak repair requirements4 topics
- 1.Allowable leak rate for commercial and industrial process refrigeration
- 2.Allowable leak rate for other appliances containing more than 50 pounds of refrigerant
- 3.Leak repair recordkeeping
- 4.Extensions to the timeframe to repair leaks that exceed the threshold leak rate
CRecovery Techniques4 topics
- 1.Recovering liquid at beginning of recovery process speeds up process
- 2.Other methods for speeding recovery (chilling recovery vessel, heating appliance or vessel from which refrigerant is being recovered)
- 3.Methods for reducing cross-contamination and emissions when recovery or recycling machine is used with a new refrigerant
- 4.Need to wait a few minutes after reaching required recovery vacuum to see if system pressure rises (indicating that there is still liquid refrigerant in the system or in the oil)
DRecovery Requirements7 topics
1.Evacuation requirements for high-pressure appliances in each of the following situations
- a.Disposal
- b.Major versus non-major repairs
- c.Leaky versus non-leaky appliances
- d.Appliance (or component) containing less versus more than 200 pounds
- e.Recovery/recycling equipment built before versus after November 15, 1993
- 2.Definition of "major" repairs
- 3.Prohibition on using system-dependent recovery equipment on systems containing more than 15 pounds of refrigerant
ERefrigeration4 topics
- 1.How to identify refrigerant in appliances
- 2.Pressure-temperature relationships of common high-pressure refrigerants [may use standard temperature-pressure chart--be aware of need to add 14.7 to translate pounds per square inch gauge (psig) to pounds per square inch absolute (psia)]
- 3.Components of high-pressure appliances (receiver, evaporator, accumulator, etc.) and state of refrigerant (vapor versus liquid) in them
- 4.The idea that hydrocarbons are not approved for retrofits
FSafety2 topics
- 1.Shouldn't energize hermetic compressors under vacuum
- 2.Equipment room requirements under American Society of Heating, Refrigerating, and Air-Conditioning Engineers (ASHRAE) Standard 15 (oxygen deprivation sensor with all refrigerants)
From EPA's Section 608 test topics, read October 20, 2026. All four 608 topic lists, and the test format in the regulation's words →
High-yield EPA 608 Type II (High-Pressure) topics
The material that shows up year after year. If you're short on time, start here.
- Table 1 sets the recovery level by charge. A high-pressure appliance with a full charge under 200 pounds needs 0 inches Hg vacuum. At 200 pounds or more, which includes exactly 200, it needs 10 inches Hg with equipment made on or after November 15, 1993.
- Equipment made before November 15, 1993 only has to reach 4 inches Hg on a high-pressure appliance of 200 pounds or more. Very high-pressure appliances need 0 inches Hg either way. Check the charge, the equipment date and the pressure class before you answer.
- Leak repair rules apply to appliances of 50 pounds or more of a class I or class II (ozone-depleting) refrigerant such as R-22 (40 CFR 82.157), and since January 1, 2026 to appliances of 15 pounds or more with covered HFC refrigerants, except residential and light commercial air conditioning and heat pumps (40 CFR 84.106). The trigger leak rates are 20 percent for commercial refrigeration, 30 percent for industrial process refrigeration, and 10 percent for comfort cooling and other appliances. Above the rate, you identify and repair leaks within 30 days of adding refrigerant, or 120 days if an industrial process shutdown is required.
- A major repair removes the compressor, condenser, evaporator or an auxiliary heat exchange coil, or uncovers an opening of more than 4 square inches of flow area for more than 15 minutes. Before you open the appliance for a major repair, evacuate to the Table 1 level. A non-major repair that will not be followed by evacuation to the atmosphere only needs the appliance at 0 psig before you open it.
- Every repaired leak gets an initial and a follow-up verification test. The initial test comes before any refrigerant goes back in if the repair needed evacuation, and after the work but before any added refrigerant if it did not. The follow-up test is due within 10 days of a successful initial test, or of the appliance reaching normal operation if it was evacuated.
- Leak test gas order of preference: nitrogen alone is best, nitrogen with a trace of R-22 is next, and pure refrigerant is last. System-dependent recovery equipment may not be used on an appliance with a full charge of more than 15 pounds. The one exception is a pump-out unit permanently attached to the appliance.
Where techs lose points on EPA 608 Type II (High-Pressure)
Good technicians miss these — not from lack of skill, but because the question is built to catch them.
- Trap: you can leave a leak alone until the system is empty. Once a covered appliance goes over its trigger rate (10, 20 or 30 percent by type), the owner has 30 days to repair, or 120 with an industrial process shutdown. The other choice is a retrofit or retirement plan, with the work finished within one year of the plan's date.
- Trap: 10 inches Hg applies to every high-pressure appliance. It applies only at 200 pounds or more with equipment made on or after November 15, 1993. Under 200 pounds it is 0 inches Hg, and older equipment on a 200-pound-plus system needs 4.
- Trap: a busy schedule or a high repair bill earns more time on a leak. The rule lists only radiological contamination, other regulations that make repair within the period impossible, and replacement parts that are not available in time. Cost and scheduling are not on the list.
- Trap: a pressure or vacuum decay test finds the leak. It only shows the appliance is losing refrigerant. EPA's leak inspection definition says to pair it with a method that locates the leak, such as an ultrasonic test, bubble test or leak detection device.
A study plan that works for EPA 608 Type II (High-Pressure)
Roughly two weeks of real preparation, in the order that actually builds on itself.
- Day 1: Leak detection. Learn the signs of a leak (excess superheat, oil traces on hermetic systems), why you leak test before charging, and the test gas order.
- Day 2: Leak repair rules. Drill the 10, 20 and 30 percent rates, the 50-pound and 15-pound thresholds, the 30 and 120 day clocks, the listed extensions, the verification tests and the three-year records.
- Day 3: Recovery. Memorize Table 1 by charge and equipment date, the definition of a major repair, the 15-pound system-dependent rule, and the techniques for speeding recovery and clearing the machine between refrigerants.
- Day 4: Refrigeration and safety, then practice. Work pressure-temperature charts (add 14.7 to turn psig into psia), know why you never energize a hermetic compressor under vacuum, then take practice sets and review every miss.
Sample EPA 608 Type II (High-Pressure) questions
Straight from the bank — answers highlighted, with the explanation underneath.
A high-pressure chiller or air-conditioning system shows a higher-than-normal suction superheat and a low charge indication. What is the most likely cause?
- Non-condensables are trapped in the condenser
- The oil charge is too high
- The condenser is overcharged with liquid
- Refrigerant has leaked out and the system is undercharged
Under the EPA leak repair rules, what is the applicable leak rate that triggers repair for an industrial process refrigeration appliance with a full charge of 50 pounds or more of a class I or II refrigerant?
- 30 percent
- 20 percent
- 10 percent
- 35 percent
On a large high-pressure system holding both liquid and vapor refrigerant, why does a technician normally begin recovery by removing the liquid?
- Vapor cannot be recovered until the compressor has been replaced first
- Liquid moves far more refrigerant per minute than vapor, so the job goes faster
- The EPA requires every technician to recover liquid before any vapor
- Liquid recovery alone brings the system below the required evacuation level
Ready to pass E608T2?
Get all 175 E608T2 questions plus timed full-length mock exams, a high-yield “must-know” filter, and readiness tracking that tells you when you're actually ready.
Start your 24-hour free trial